Materiały konferencyjne SEP 2018
• Rapid roadway development system in Coal or Industrial minerals • Simultaneous cutting & bolting provide advance rates up to 6m/hour • Support high return on Investment – faster LW start up • Immediate roof support for high quality roadway • 4 roof & 2 rib drill rigs for simultaneous cutting & bolting operation 10 • Highest safety standard with integrated roof support • Rock support installed immediately upon excavation • No people exposed to unsupported ground • Applications requiring roof bolting with flat roof top • Applications with need for high advance rates • Applications with need to improve time to mass production • With stabilized sump frame cutting concept ability to cut rock up to 75 MPa with hard intrusions beyond this limit Selection Criteria Key Value Safety KEY CUTTING TECHNOLOGY
Made with FlippingBook
RkJQdWJsaXNoZXIy NTcxNzA3