Materiały konferencyjne SEP 2018

• Rapid roadway development system in Coal or Industrial minerals • Simultaneous cutting & bolting provide advance rates up to 6m/hour • Support high return on Investment – faster LW start up • Immediate roof support for high quality roadway • 4 roof & 2 rib drill rigs for simultaneous cutting & bolting operation 10 • Highest safety standard with integrated roof support • Rock support installed immediately upon excavation • No people exposed to unsupported ground • Applications requiring roof bolting with flat roof top • Applications with need for high advance rates • Applications with need to improve time to mass production • With stabilized sump frame cutting concept ability to cut rock up to 75 MPa with hard intrusions beyond this limit Selection Criteria Key Value Safety KEY CUTTING TECHNOLOGY

RkJQdWJsaXNoZXIy NTcxNzA3